page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30 page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
< prev - next > Energy Wind power wind_turbine_pmg_manual (Printable PDF)
31. STATOR CASTING
ELEMENTS
M12
bolt studs
jig
inner
mould
CSM disk
coils
CSM strips
CSM disk
outer
mould
The casting is now complete. It should become slightly warm, and harden within
hours. If it does not begin to set within a few hours, then put it in a warm place to
speed up the process.
When the resin is fully hard, remove the casting from the mould. Be patient and
gentle if possible. Remove the jig from the studs. Tap the two moulds apart, using a
bolt in each of the holes around the central hole. Knock the casting out of the outer
mould by turning it over and knocking the edge of the mould gently against the floor.
PMG manual
page 30
June 2001